ADU360ADU360
Check my lot, free
MenuClose
ADU360
Program · Single-family lots

Two lots where you had one

SB 9 lets a single-family lot be split in two, with up to two homes on each. Unlike an ADU, the new lot can be sold on its own.

2
lots from one
1,200 sq ft
minimum per new lot
40/60
the most uneven split allowed
Up to 4
homes across both lots
Who qualifies

You're likely a fit if

  • A single-family zoned lot
  • Not a historic district or landmark
  • The split won't demolish or alter housing a tenant lived in during the last 3 years
  • You'll live in one of the homes for 3 years after a split
On the lot

What it looks like

The orange piece is what gets built.

SB 9: Split Your Lot
How we do it

How it runs

01
Split check

Lot size, frontage, access and whether the split works at all.

02
Parcel map and design

Survey, the split itself and the homes on each lot.

03
Approvals

The city approves the split ministerially, then the building permits.

04
Build

One home, two, or a sale of the new lot.

Questions

What owners ask

SB 9 or an ADU?

If you want to sell the new home someday, SB 9. If you want rent and to keep one property, an ADU is cheaper and faster.

Can I add ADUs after a split?

Generally the combined limit is two homes per lot, counting ADUs.

Sources

Where this comes from

Checked October 2026. Laws change; we re-check every project against the current code before design. General information, not legal, tax or financial advice.

Source
SB 9 (2021), Gov. Code 65852.21 and 66411.7
SB 450 (2024) amendments

Does your property qualify?

Send the address. We check it against this program and every other one.