ADU types
Five ways to add a home
Most lots can hold more than one of these. The cheapest is often not the one people picture.

Pick the one your lot wants
What each one is and who it suits.

Garage Conversion
The garage becomes a home. No new setbacks, no replacement parking, and usually the least costly full-size unit.
Learn more
Junior ADU (JADU)
Up to 500 sq ft carved out of the house you have. The smallest budget and the simplest permit.
Learn more
Attached ADU
A new wing that shares a wall with the house and has its own front door. Good for narrow lots.
Learn more
Detached ADU
Its own building in the back yard. The most privacy of any type.
Learn more
Above-Garage and Second-Story ADU
Keep the parking and the yard, add a home upstairs.
Learn moreCompare
Side by side
Typical timelines from the first call to move-in.
Southern California, October 2026
| Type | Key rule | First call to move-in |
|---|---|---|
| Garage Conversion | 0 replacement parking spaces | 6-10 months |
| Junior ADU (JADU) | 500 sq ft maximum size | 4-8 months |
| Attached ADU | 4 ft side and rear setbacks | 10-16 months |
| Detached ADU | 4 ft side and rear setbacks | 12-18 months |
| Above-Garage and Second-Story ADU | Up to 25 ft height when attached | 14-20 months |
The rules
What every city has to allow
State law sets a floor no California city can go below.
Which one fits your lot?
Send the address. We'll tell you which of these fit your lot.
