What a garage conversion really costs

Pick the size and the finish. The estimate is all-in: design, permits, a bathroom and a kitchenette.

$120k to $150kTypical 2-car
6 to 9 moStart to keys
0Parking spaces to replace

Live estimate

Size up your garage

Garage size

The finish

Your estimate, all-in

$135,000

420 sq ft at about $321 per sq ft, Comfort finish

Most land between $120,000 and $150,000

Includes design, permits and fees, a bathroom and a kitchenette. A panel upgrade, a long sewer run or repairs to an older garage are priced after we see it.

Book a free walk-through

Free · We measure it on site · No obligation

Why it costs less

Half the house is already built

01
The slab is poured

Most garage floors can stay. We level them, add a moisture barrier and cut in the drains.

02
The shell is standing

Walls and roof are there, so the money goes into insulation, windows, a kitchen and a bath.

03
No parking to replace

California law doesn't let a city require new parking when a garage becomes an ADU.

The base line

What the conversion covers

  • Design, engineering and the energy report
  • Permits and city fees
  • Insulation, drywall and a finished ceiling
  • The garage door opening framed in, with windows and an entry
  • Flooring throughout
  • Heating and cooling
  • Lights, outlets and smoke alarms
  • Final inspection
What moves it

Six things that swing the number

01
Bathroom and kitchen

The two rooms with plumbing are the biggest lines after the shell.

02
Distance to the sewer

A short, downhill run is simple. A long or uphill one may need a pump.

03
The electrical panel

Many older houses need a larger panel to carry a second kitchen.

04
Age of the garage

Cracked slabs, sagging roofs and termite damage get fixed before finishes go in.

05
Attached or detached

Attached needs a fire-rated wall. Detached needs power and water trenched across the yard.

06
Your city

Fees, plan check and utility rules differ from one city to the next.

How it runs

From walk-through to keys

01
Walk-through

We measure the garage, check the slab, roof framing, panel and sewer route.

02
Design

Layout, windows, the new entry and the energy report. Usually 4 to 8 weeks.

03
Permit

Conversions are often the quickest plan check, typically 6 to 12 weeks.

04
Build

Typically 3 to 5 months, then final inspection and keys.

Questions

Garage conversion cost questions

How close is the calculator to a real quote?

It gives a market range for Southern California. A walk-through of your garage sets the real number, in writing, before you commit.

Why is it a range and not one price?

Two garages the same size can differ a lot underneath: the slab, the panel and the sewer run. The range covers what we usually find.

Can the old slab stay?

Often, but not always. We check for cracks, moisture and the slope to the new drains during the walk-through.

Do I have to replace the parking?

No. State law says a city can't require replacement parking when a garage is converted to an ADU.

Will my property taxes go up?

Only the value the conversion adds is assessed. The rest of your property keeps its current assessed value.

Can I rent it out?

Yes, as a long-term rental. Many cities limit short-term rentals for ADUs, so we check your city's rule.

Get the real number

Book a free walk-through. We measure the garage and send a written price.